Industry insights, project highlights, and expert knowledge from the field. Learn how hydrovac excavation is transforming infrastructure work across North Dakota and Colorado.
When a major pipeline operator needed to locate and expose 12 miles of buried infrastructure in western North Dakota, traditional excavation methods posed unacceptable risk. Here's how hydrovac technology delivered zero-strike results.
Read Case Study →A ruptured water main in sub-zero conditions required immediate hydrovac excavation. Our team mobilized within 90 minutes, working through extreme cold to restore service to 2,000 residents in under 8 hours.
Read Case Study →A Colorado telecommunications provider needed fiber optic cable installed under Interstate 25 near Fort Collins. Horizontal directional drilling completed the 800-foot crossing in 2 days with zero traffic disruption.
Read Case Study →Let's discuss how hydrovac excavation can save time, money, and risk on your next project.